This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
en:survey:publish [19.03.2015 14:08] – [Defining the survey administration period] muhammad.rizwan | en:survey:publish [24.07.2024 08:52] (current) – [Set the Survey Administration Period] admin | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ====== | + | ====== |
- | + | ||
- | When you set the survey administration period in the **Project Settings**, the questionnaire becomes accessible for the respondents. Prior to saving the survey administration period, the software checks whether you made all necessary settings. Red crosses in the **Project Settings**, indentify settings which were not defined yet. | + | |
- | The survey | + | The survey period |
- | **Note:** By default all questionnaires are accessible for the public without restriction | + | Enter a survey period in the **Project settings** (**Survey project** -> **Project Settings**) in the //Publish Questionnaire// |
+ | Above you will see a short checklist of the settings you should check before releasing the questionnaire. Red crosses in the checklist indicate missing settings. | ||
- | ====== Prolonging | + | Before the start and after the end of the period, respondents are shown an message that the survey is not yet available or has already been completed. The exact wording can be adjusted under **Textelements and Labels**. |
- | The survey administration period is limited, for technical reasons in order to avoid inactive surveys, to three months. However, if a longer survey administration period is needed, a prolongation is always possible. | + | **Note:** By default, a questionnaire is publicly accessible during the survey period for anyone who knows the link. To restrict access, see [[: |
+ | |||
+ | |||
+ | ===== Extending the Survey Administration Period ===== | ||
+ | |||
+ | The survey administration period is first limited, for technical reasons in order to avoid inactive surveys, to three months. However, if a longer survey administration period is needed, a prolongation is always possible. | ||
* You can set this in the area **Project summary** prior to the originally set end date. In this way, the survey administration period can be prolonged as many times as needed. | * You can set this in the area **Project summary** prior to the originally set end date. In this way, the survey administration period can be prolonged as many times as needed. | ||
- | * Generally you can change the survey administration period at any given point in time (e.g. as of the actual date). You do this in the area **Project Settings**. In case you change the survey administration period prior to its originally set ending date, then the survey administration continues without interruption; | + | * Generally you can change the survey administration period at any given point in time (e.g. as of the actual date). You do this in the area **Project Settings**. In case you change the survey administration period prior to its originally set ending date, then the survey administration continues without interruption; |
+ | |||
+ | |||
+ | ===== Adjust per Questionnaire ===== | ||
+ | |||
+ | The administration period is in the survey project is used for all questionnaires in the project. But it is also possile to change the administration period for individual questionnaires via [[: | ||
+ | |||
+ | For this purpose, a PHP code is inserted on the first page of the questionnaire as the first element, which checks the current time and rejects the respondents if necessary. If the administration period should be available between the 15th to 17th March 2021, the PHP code would look like the following: | ||
+ | |||
+ | <code php> | ||
+ | $now = time(); | ||
+ | if (($now < strtotime(' | ||
+ | text(' | ||
+ | buttonHide(); | ||
+ | pageStop(); | ||
+ | } | ||
+ | </ | ||
+ | |||
+ | The '' | ||
+ | |||
+ | In the second '' | ||
+ | |||
+ | The function '' | ||
+ | |||
+ | **Note:** Once the questionnaire is started the further completion is also beyond the administration period possible. This is different at the administration period for the hole project. | ||
+ | |||
+ | ---- | ||
+ | |||
+ | **Search terms:** Data Collection, Survey Administration Period, Study period, Survey, Field Time, Investigation Period, Research Period |